Production Equipment System Of Urea Liquid For Automobile

Sep 06, 2018 Leave a message

Automotive urea production equipment by the pre-mixing system, heat exchange system, initial filtration system, homogeneous system, decolorization system, purification system, regeneration system, etc., this operating mode for the current domestic advanced mature car urea liquid production equipment, has entered a large-scale industrial production stage. 

1) Automotive Urea production equipment pre-mixing system: the use of uniform system, the removal of some aldehydes in the raw materials, and play a homogeneous role. 2) car urea liquid production equipment heat Exchange system (optional): adjust to the process requirements of temperature.

The bagged granular urea needs to be heated up so that the urea particles are more easily dissolved (party a provides steam). 3) Automotive urea production equipment filtration and decolorization system: Remove suspended solids and other floating impurities in the urea, to ensure that the process is not affected.

Decolorization system using high-quality activated carbon adsorption decolorization, remove other organic impurities in urea, so that the urea solution more clear.

4) Automotive Urea production equipment fine filtration system: To prevent the bleaching system of activated carbon particles into the post-processing process, affecting the quality of the product after the road.

5) Automotive Urea production Equipment purification system: the use of multi-stage purification tower method, the removal of urea solution of various ions, shrinkage urea, phosphoric acid and other impurities, to ensure that the product in line with China Automotive Engineering Society Technical Specifications GB 29518-2013 diesel engine nitrogen oxide reducer urea aqueous solution (AUS 32) standard requirements.

6) Automotive Urea production Equipment microfiltration system: Interception of the production process in the pipeline, storage tanks, power equipment and other possible invisible residual impurities, to ensure the quality of the finished product stable and reliable. 7) Vehicle Urea production equipment restore regeneration system: The purification tower in the process of production process gradually failure, to a certain period of time need to restore regeneration treatment, the process takes 6-8 hours. Re-use of the purification tower after reduction and regeneration can fully meet the original production process requirements. During each regeneration cycle, 2 tonnes of waste water is produced, which does not contain other heavy metals, and is mainly ph non-conforming.

Through the medium and the adjustment can achieve environmental protection emission standards? 8) Wastewater Treatment System: Treatment of waste liquid produced during the restoration process to the standard discharge. This section of the other design, not the plan and the scope of the offer. Wastewater Treatment Process: Wastewater collection pool → wastewater ph adjustment tank → treatment of wastewater discharge tank